2022 1Z0-1075-21 dumps review - Professional Quiz Study Materials 1Z0-1075-21 Test Prep Training Practice Exam Questions Practice Tests NEW QUESTION 29 Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item. A. Set the nonstocked [...]

2022 1Z0-1075-21 dumps review - Professional Quiz Study Materials [Q29-Q51]

Share

2022 1Z0-1075-21 dumps review - Professional Quiz Study Materials

1Z0-1075-21 Test Prep Training Practice Exam Questions Practice Tests

NEW QUESTION 29
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
  • B. Set the global sourcing rule in GOP to determine supply creation option as Make.
  • C. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
  • D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
  • E. Set a local sourcing rule in GOP to determine supply creation option as Make.

Answer: A,B

 

NEW QUESTION 30
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.

  • A. Work Order (WO-1025) is not a Back-to-Back Work Order.
  • B. Work Order (WO-1025) is not a Plan-to-produce Work Order.
  • C. Work Order (WO-1025) is not a Pick-to-order Work Order.
  • D. Work Order (WO-1025) is not a Configured item Work Order.
  • E. Work Order (WO-1025) is not a Drop-ShipWork Order.

Answer: D,E

 

NEW QUESTION 31
You are setting up Fusion Manufacturing to support Back-to-BackFulfillment.
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources.

  • A. Select the Used in Planning check box in the Work Structure.
  • B. Select the Used in Planning check box inthe Work Definition Names.
  • C. Select the Used in Planning check box in the new Work Definition.
  • D. Select the Used in Planning check box in the item definition.

Answer: B

 

NEW QUESTION 32
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

  • A. Complete with Details
  • B. Quick Complete
  • C. Change status of Operation to completed
  • D. Change Move status to Ready.
  • E. Complete using quantity completion

Answer: A,B

 

NEW QUESTION 33
Your customer hasthe following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goodsas one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

  • A. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.
  • B. The two Work Definitions can be tied through Projector Seiban numbers.
  • C. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
  • D. The Work Definition versions can be used to tie the Work Orders.

Answer: D

 

NEW QUESTION 34
In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies formthe Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?

  • A. Replenishment Requests
  • B. Batch Wave Movement Requests
  • C. Requisition Movement Requests
  • D. Pick Wave MovementRequests

Answer: C

 

NEW QUESTION 35
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Manage Work Orders
  • B. Report Resource, Material and OperationTransactions
  • C. Review Production Transaction History
  • D. Review Dispatch List

Answer: A

 

NEW QUESTION 36
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

  • A. Manufacturing Engineer
  • B. Production Engineer
  • C. Production Supervisor
  • D. Manufacturing Supervisor
  • E. Production Operator

Answer: A

 

NEW QUESTION 37
Identify thetwo capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

  • A. You can mass create and update work definitions and their operations, items only and cannot add resources in work definitions.
  • B. You can mass create and update work definitions and their operations, items, and resources.
  • C. You can mass create and update work definitions and their operations only and cannot add items and resources in work definitions.
  • D. You can copy work definitions form one organization to another organization.

Answer: B,D

 

NEW QUESTION 38
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

  • A. Procurement
  • B. Inventory Min-Max Planning
  • C. Planning
  • D. Order Management
  • E. Quality

Answer: A,C,D

 

NEW QUESTION 39
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

  • A. Oracle Business Intelligence Application
  • B. Oracle Business Intelligence Enterprise Edition
  • C. Oracle Business Intelligence Publisher
  • D. Oracle Business Intelligence Standard Edition

Answer: C

 

NEW QUESTION 40
While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered =Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.

  • A. WIP = Yes, Customer Ordered = No
  • B. WIP = Yes, Customer Ordered = Yes
  • C. WIP = No, Customer Ordered = Yes
  • D. WIP = No, CustomerOrdered = No

Answer: C

 

NEW QUESTION 41
A plantruns 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?

  • A. 1:00 PM
  • B. 12:30 PM
  • C. 8:00 PM
  • D. 4:00 PM
  • E. 2:00 PM

Answer: D

 

NEW QUESTION 42
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse from scrap to ready.
  • B. Reverse resources charged to a work order.
  • C. Reverse from reject to ready.
  • D. Reverse material issued to a work order.
  • E. Reverse the product at the last operation.
  • F. Reverse at an operation.

Answer: A,B,C,D

 

NEW QUESTION 43
In a manufacturing plant, a production operator in a givenshift completes a car assembly and reports this using orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.

  • A. Material usage
  • B. Scrap material
  • C. Resource usage
  • D. Processing steps
  • E. Return material

Answer: A,C

 

NEW QUESTION 44
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
  • B. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.
  • C. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
  • D. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.

Answer: B

 

NEW QUESTION 45
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. State Date
  • B. Version
  • C. Production Priority
  • D. CostingPriority

Answer: A,B

 

NEW QUESTION 46
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
  • B. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • D. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, andclick Send.

Answer: B

 

NEW QUESTION 47
Identify three requirements fulfilled by nonstandard work orders.

  • A. Repair
  • B. Rescheduling
  • C. Prototype
  • D. Rework

Answer: A,C,D

 

NEW QUESTION 48
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

  • A. 60 hours
  • B. 76 hours
  • C. 70 hours
  • D. 78 hours

Answer: D

 

NEW QUESTION 49
During a Manufacturing Cloud implementation, the Production Supervisor wants to close thework orders for last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.

  • A. Work order costs can be updated anytime regardless of the status of the work order.
  • B. The Production Supervisor need not include cost variances while costing last month's workorders because those can be applied directly in subledger accounting.
  • C. The Production Supervisor needs to include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected, should not be closed.
  • D. The Production Supervisor should make sure that all costs are included while closing last month's work orders; however, variances can be included after closing the work orders.

Answer: C

 

NEW QUESTION 50
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

  • A. Deselect the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • B. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.
  • C. Select the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • D. Use a Resource exception for the resource and alter its usage.

Answer: C

 

NEW QUESTION 51
......


Oracle 1Z0-1075-21 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe Managerial Accounting Basics & Cost Accounting
  • Explain Work Order Reservations and History
Topic 2
  • Describe Manufacturing Supervisor Mobile Applications
  • Transfer Production Transactions to Costing
Topic 3
  • Describe Production Execution transactions (including Outside Processing)
  • Describe Functional Set Up Manager and Simplified Setup
Topic 4
  • Explain Common Inventory Configurations
  • Describe Import Production Transactions
  • Describe Manufacturing Lead-time
Topic 5
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers
Topic 6
  • Create manufacturing Production Exceptions, including raising exceptions and managing and resolving exceptions
  • (New) Set up common Configuration Elements
Topic 7
  • Set up and implement Cost Planning estimates
  • Describe and Compute Production Costs
  • Explain Work Execution Work Areas
Topic 8
  • Execute Basic Transaction and Work Order Reporting
  • Explain Common Projects Enabled SCM Configurations
Topic 9
  • Evaluate a Work Order completion cost, including Partial and Scrap