Certification Training for E_S4HCON2022 Exam Dumps Test Engine [2023] Jul 03, 2023 Step by Step Guide to Prepare for E_S4HCON2022 Exam NEW QUESTION # 31 You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.Following SAP recommendations, how will you achieve this?There are 2 correct answers to this question.Response: [...]

[Q31-Q54] Certification Training for E_S4HCON2022 Exam Dumps Test Engine [2023]

Share

Certification Training for E_S4HCON2022 Exam Dumps Test Engine [2023]

Jul 03, 2023 Step by Step Guide to Prepare for E_S4HCON2022 Exam

NEW QUESTION # 31
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Import a transport request from the development system that contains the recording of the activation.
  • B. Specify the business functions that need to be switched on during the prepare part of SUM.
  • C. Activate the required business functions manually in the production system.
  • D. During conversion, SUM delivers some business functions already activated.

Answer: A,D


NEW QUESTION # 32
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Unicode conversion
  • B. Database migration
  • C. Software update
  • D. Custom code analysis

Answer: B,C


NEW QUESTION # 33
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as In the start release
  • B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
  • C. SUM continues with the next phase and your modifications are lost
  • D. Before continuing with the next phase SUM asks for a modification adjustment transport

Answer: A


NEW QUESTION # 34
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished

Answer: A


NEW QUESTION # 35
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in the development client of the development system
  • B. Credentials of a named user in the development client of the development system
  • C. Credentials of user DDIC in client 000 of the shadow system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: B


NEW QUESTION # 36
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. DMO without system update
  • C. SAP S/4HANA conversion without DMO
  • D. SAP S/4HANA conversion including DMO
  • E. Benchmark tool

Answer: A,C,D


NEW QUESTION # 37
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. An SAP S4HANA 1709 sandbox system
  • B. A Standalone SAP system with ABAP 7.51 or above
  • C. AA

Answer: A,B


NEW QUESTION # 38
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 39
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Standard" when applying SAP Support Packages
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the database migration option (DMO) for SUM
  • D. Using the main configuration option "Single System" in case of an upgrade.

Answer: B


NEW QUESTION # 40
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

  • A. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
  • B. You can verify that the content of the download directory matches the stack XML file.
  • C. You can find the optimal number of parallel H3load processes by monitoring host performance
  • D. You can record the modification adjustment during migration and use the transports in the next runs.

Answer: A,C


NEW QUESTION # 41
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. The corrections to the SUM Guide
  • B. An overview about possible upgrade paths
  • C. The link to different patch levels to SUM
  • D. AA

Answer: A,B,C


NEW QUESTION # 42
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phases EU_IMPORT*
  • B. Phase DOWNCONF_DTTRANS
  • C. Phase RUN_RSDBSCPY
  • D. Phase RUN_RSPTBFIL _ISUTABU
  • E. Phases DIFF*

Answer: A,B,E


NEW QUESTION # 43
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. DMO can only be run with systems NW740 or NW731
  • B. Target DB size will increase temporarily
  • C. A

Answer: A,B


NEW QUESTION # 44
ICNV initialization does 3

  • A. Build index on flag column
  • B. Creation of views
  • C. Creation of flag
  • D. AA

Answer: A,B,C


NEW QUESTION # 45
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:

  • A. Credentials of a named user in the development client of the development system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of user DDIC in client 000 of the shadow system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: D


NEW QUESTION # 46
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. SAP S/4HANA conversion to SAP S/4HANA 1709
  • B. Using DMO when applying Support Packages to SAP ECC 6.07
  • C. Upgrading to SAP ECC 6.08 without using DMO
  • D. Updating to SAP ECC 6.07 using DMO

Answer: A,C


NEW QUESTION # 47
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

  • A. PARDIST_SHD
  • B. TABIMJJPG
  • C. TABIM_SHADOW_*
  • D. PARMVNT_UPG

Answer: B


NEW QUESTION # 48
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Upgrade the SAP system
  • B. Apply SAP support packages
  • C. Use DMO for SUM
  • D. Perform an SAP S/4 HANA conversion including DMO
  • E. Perform an SAP S/4 HANA conversion without DMO

Answer: A,B,C


NEW QUESTION # 49
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the job log for the corresponding job in SM37 (Job Overview)
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • D. In the corresponding R3trans log files of this phase

Answer: A,B


NEW QUESTION # 50
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • B. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Answer: C


NEW QUESTION # 51
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Uninstall Fiori apps not released for SAP_UI 7.50
  • B. Install add-on SAP Gateway 7.50
  • C. Delete client 066 (Early Watch Client)
  • D. Uninstall industry extensions not supported by SAP S/4HANA

Answer: A,C


NEW QUESTION # 52
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Stack XML file calculated by the Maintenance Planner
  • B. Parameter file SAPup_add.par
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. MIGRATE J5T_DUR_XML file from a previous run

Answer: A,D


NEW QUESTION # 53
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It is a database-specific document.
  • B. It contains a section about the simplification item (SI) checks.
  • C. It explains where to find information about the custom code analysis.
  • D. It explains the database migration option (DMO) of SUM.

Answer: B,C


NEW QUESTION # 54
......

Ultimate Guide to Prepare E_S4HCON2022 Certification Exam for SAP Certified Technology Specialist: https://pass4sure.guidetorrent.com/E_S4HCON2022-dumps-questions.html